Chippewa Northwestern Railway Co. Current Maintenance Projects

Tamp, align and ballast track 1 from south plant into station track.
 
Tamp, align and ballast track 2 from south plant into station track.
 
Tamp and ballast the yard tracks and leg of the wye at Alpine.
 
Tamp and ballast the siding and industrial tracks at North loop.
 
Tamp and ballast the yard lead and pocket track at Goehner.
 
Paint the North side of the Car Barn. Red barn paint is in the garage by the the wooden file cabinet.
 
Empty the garbage in the metal 55 gallon drum back by Alpine into blue trash cans.
 
Inspect ALL joint bars on the railroad and install missing track bolts as needed.
 
Clean the pine needles out from under the car barn tracks using the air hose from the garage.
2/04/2008

2008 Run Day schedule is up