Chippewa Northwestern Railway Co. Current
Maintenance Projects
Tamp, align and ballast track 1 from south plant
into station track.
Tamp, align and ballast track 2 from south plant
into station track.
Tamp and ballast the yard tracks and leg of the
wye at Alpine.
Tamp and ballast the siding and industrial tracks
at North loop.
Tamp and ballast the yard lead and pocket track
at Goehner.
Paint the North side of the Car Barn. Red barn
paint is in the garage by the the wooden file cabinet.
Empty the garbage in the metal 55 gallon drum
back by Alpine into blue trash cans.
Inspect ALL joint bars on the railroad and
install missing track bolts as needed.
Clean the pine needles out from under the car
barn tracks using the air hose from the garage.